Egypt, World Bank evaluate 'Managing Air Pollution, Climate Change in Greater Cairo' project    Egypt's international reserves climb to $41.057bn in April 2024    UBS job cuts to start late '24 – CEO    Russian court seizes $13m from JPMorgan, Commerzbank    Germany's March '24 manufacturing orders dip 0.4%    Aramco's net income falls 14.4% in Q1 '24 – report    Amazon to invest $8.88b into Singapore cloud infrastructure    Egypt leads MENA surge as Bitget Wallet sees 300% growth    Health Ministry on high alert during Easter celebrations    Egypt's Communications Ministry, Xceed partner on AI call centre tool    Egypt warns of Israeli military operation in Rafah    US academic groups decry police force in campus protest crackdowns    US Military Official Discusses Gaza Aid Challenges: Why Airdrops Aren't Enough    US Embassy in Cairo announces Egyptian-American musical fusion tour    Chubb prepares $350M payout for state of Maryland over bridge collapse    Egypt, France emphasize ceasefire in Gaza, two-state solution    Japanese Ambassador presents Certificate of Appreciation to renowned Opera singer Reda El-Wakil    Sweilam highlights Egypt's water needs, cooperation efforts during Baghdad Conference    AstraZeneca injects $50m in Egypt over four years    Egypt, AstraZeneca sign liver cancer MoU    Swiss freeze on Russian assets dwindles to $6.36b in '23    Amir Karara reflects on 'Beit Al-Rifai' success, aspires for future collaborations    Climate change risks 70% of global workforce – ILO    Prime Minister Madbouly reviews cooperation with South Sudan    Egypt retains top spot in CFA's MENA Research Challenge    Egyptian public, private sectors off on Apr 25 marking Sinai Liberation    Debt swaps could unlock $100b for climate action    President Al-Sisi embarks on new term with pledge for prosperity, democratic evolution    Amal Al Ghad Magazine congratulates President Sisi on new office term    Egyptian, Japanese Judo communities celebrate new coach at Tokyo's Embassy in Cairo    Uppingham Cairo and Rafa Nadal Academy Unite to Elevate Sports Education in Egypt with the Introduction of the "Rafa Nadal Tennis Program"    Financial literacy becomes extremely important – EGX official    Euro area annual inflation up to 2.9% – Eurostat    BYD، Brazil's Sigma Lithium JV likely    UNESCO celebrates World Arabic Language Day    Motaz Azaiza mural in Manchester tribute to Palestinian journalists    Russia says it's in sync with US, China, Pakistan on Taliban    It's a bit frustrating to draw at home: Real Madrid keeper after Villarreal game    Shoukry reviews with Guterres Egypt's efforts to achieve SDGs, promote human rights    Sudan says countries must cooperate on vaccines    Johnson & Johnson: Second shot boosts antibodies and protection against COVID-19    Egypt to tax bloggers, YouTubers    Egypt's FM asserts importance of stability in Libya, holding elections as scheduled    We mustn't lose touch: Muller after Bayern win in Bundesliga    Egypt records 36 new deaths from Covid-19, highest since mid June    Egypt sells $3 bln US-dollar dominated eurobonds    Gamal Hanafy's ceramic exhibition at Gezira Arts Centre is a must go    Italian Institute Director Davide Scalmani presents activities of the Cairo Institute for ITALIANA.IT platform    







Thank you for reporting!
This image will be automatically disabled when it gets reported by several people.



Japan's nuclear industry growing, but slower than government hoped
Published in Amwal Al Ghad on 05 - 11 - 2018

Japan's resurgent nuclear industry will miss a government target of providing at least a fifth of the country's electricity by 2030, a Reuters analysis shows.
With eight reactors running and one more set to come online in November, nuclear has this year overtaken non-hydro renewables in power output for the first time since the 2011 catastrophe, when all of the country's nuclear plants were idled.
Yet operators can expect as few as six units to restart in the next five years, and fewer than 20 by 2030, the analysis shows. That is far short of the 30 needed to meet the government target reiterated this year.
Based on the analysis, the world's third-largest economy may get about 15 percent of its power from nuclear in 2030, compared with a government target of 20-22 percent.
"It's impossible to meet the target, that's pretty much confirmed," said Takeo Kikkawa, an energy studies professor at Tokyo University of Science, who sat on an official panel that reviewed Japan's energy policy this year.
He said he did not expect another round of restarts before 2020.
One major trading house predicts nuclear will account for 14 percent of power production in 2030, according to a presentation given at a private seminar this year and shown to Reuters.
Nuclear remains an unpopular energy option in Japan and the country will reboot only a fraction of the 54 reactors it had before the disaster.
Six reactors at Fukushima Daiichi are being dismantled in a decades-long exercise that is fraught with technological challenges and radioactive waste. Operators have decided to decommission another 10 units across the country since Fukushima.
The Nuclear Regulation Authority created new safety standards from scratch after the disaster highlighted failings in the industry and its overseers. All reactors must be relicensed before restarting.
Yet Japan's nuclear industry, which before Fukushima operated the world's third-largest number of reactors and provided about 30 percent of the country's electricity, has staged a significant recovery.
The turnaround has exceeded expectations of analysts and the utilities themselves. Kansai Electric Power and Kyushu Electric Power, for instance, have won approval to restart or are on course to win approval for all the reactors they applied to relicense.
Those units are far from Tokyo and are pressurised water reactors (PWR), unlike the boiling water reactor (BWR) designs favoured in eastern Japan, including those that melted down at Fukushima.
Many court cases are pending for reactors in the east of the country. Local political support varies, and the regulator is locked in disputes with operators over earthquake risk assessment.
The older BWR technology used in many of the reactors under review is also an issue because the stigma of Fukushima hangs over them.
"When you come to the BWRs, the issue becomes very politicized," said Nobuo Tanaka, the chairman of the Sasakawa Peace Foundation who was the head of the International Energy Agency between 2007 and 2011 after a stint in Japan's industry ministry.
The reputation of Tepco, which operates two nuclear plants that have been damaged in natural disasters, also looms large, Tanaka said.
"Tepco does not have any support as a nuclear operator," he said. The utility has to be removed from the equation before progress on BWR reactors can be made, he said.
Tepco has reached the first stage of approval, but faces strong opposition from local residents. But Japan's utility lobby group said progress was being made.
"The safety reviews of PWR plants took time but they have been progressing steadily and there have been some developments in the BWR category as well," Satoru Katsuno, the chairman of Japan's federation of electric utilities and president of Chubu Electric, said of the outlook for restart approvals.
Chubu Electric has been locked in a dispute for years with the regulator over disaster resilience measures at its Hamaoka plant, which uses BWR reactors.
The analysis suggests that Japan will rely on fossil fuels, particularly liquefied natural gas and coal, as the pace of renewables expansion slows. That will make it harder to meet its emissions targets under international agreement.
The government estimates costs for replacement fuel – mostly liquefied natural gas – to compensate for idled reactors totalled 14.6 trillion yen ($130 billion) across the industry in the six years through March.
The lack of realistic energy targets makes it harder for the industry to plan for investment, utility officials say.
And the issue of disaster resilience is not going away: a big earthquake struck the northern island of Hokkaido in September and left a nuclear plant reliant on backup generators.
source: Reuters


Clic here to read the story from its source.