Egypt Education Platform's EEP Run raises funds for Gaza    IMF approves $1.5m loan to Bangladesh    China in advanced talks to join Digital Economy Partnership Agreement    Egypt's annual inflation declines to 31.8% in April – CAPMAS    Chimps learn and improve tool-using skills even as adults    13 Million Egyptians receive screenings for chronic, kidney diseases    Al-Mashat invites Dutch firms to Egypt-EU investment conference in June    Asian shares steady on solid China trade data    Trade Minister, Building Materials Chamber forge development path for Shaq El-Thu'ban region    Cairo mediation inches closer to Gaza ceasefire amidst tensions in Rafah    Taiwan's exports rise 4.3% in April Y-Y    Microsoft closes down Nigeria's Africa Development Centre    Global mobile banking malware surges 32% in 2023: Kaspersky    Mystery Group Claims Murder of Businessman With Alleged Israeli Ties    Egypt, World Bank evaluate 'Managing Air Pollution, Climate Change in Greater Cairo' project    US Embassy in Cairo announces Egyptian-American musical fusion tour    Japanese Ambassador presents Certificate of Appreciation to renowned Opera singer Reda El-Wakil    Sweilam highlights Egypt's water needs, cooperation efforts during Baghdad Conference    AstraZeneca injects $50m in Egypt over four years    Egypt, AstraZeneca sign liver cancer MoU    Swiss freeze on Russian assets dwindles to $6.36b in '23    Amir Karara reflects on 'Beit Al-Rifai' success, aspires for future collaborations    Climate change risks 70% of global workforce – ILO    Prime Minister Madbouly reviews cooperation with South Sudan    Egypt retains top spot in CFA's MENA Research Challenge    Egyptian public, private sectors off on Apr 25 marking Sinai Liberation    Debt swaps could unlock $100b for climate action    President Al-Sisi embarks on new term with pledge for prosperity, democratic evolution    Amal Al Ghad Magazine congratulates President Sisi on new office term    Egyptian, Japanese Judo communities celebrate new coach at Tokyo's Embassy in Cairo    Uppingham Cairo and Rafa Nadal Academy Unite to Elevate Sports Education in Egypt with the Introduction of the "Rafa Nadal Tennis Program"    Financial literacy becomes extremely important – EGX official    Euro area annual inflation up to 2.9% – Eurostat    BYD، Brazil's Sigma Lithium JV likely    UNESCO celebrates World Arabic Language Day    Motaz Azaiza mural in Manchester tribute to Palestinian journalists    Russia says it's in sync with US, China, Pakistan on Taliban    It's a bit frustrating to draw at home: Real Madrid keeper after Villarreal game    Shoukry reviews with Guterres Egypt's efforts to achieve SDGs, promote human rights    Sudan says countries must cooperate on vaccines    Johnson & Johnson: Second shot boosts antibodies and protection against COVID-19    Egypt to tax bloggers, YouTubers    Egypt's FM asserts importance of stability in Libya, holding elections as scheduled    We mustn't lose touch: Muller after Bayern win in Bundesliga    Egypt records 36 new deaths from Covid-19, highest since mid June    Egypt sells $3 bln US-dollar dominated eurobonds    Gamal Hanafy's ceramic exhibition at Gezira Arts Centre is a must go    Italian Institute Director Davide Scalmani presents activities of the Cairo Institute for ITALIANA.IT platform    







Thank you for reporting!
This image will be automatically disabled when it gets reported by several people.



Time tactics on the dam
Published in Al-Ahram Weekly on 07 - 10 - 2015

“Ethiopia is repeatedly relying on time tactics. They seem to work perfectly for it,” said Maasoum Marzouk, former assistant foreign minister, describing the current status of the tripartite negotiations on the Grand Ethiopian Renaissance Dam (GERD).
On Sunday, Sudan and Ethiopia requested that Egypt postpone the 9th round of this week's tripartite meeting, scheduled for 4-5 October, to later in the month. The meeting had been called to discuss the consultancy firm commissioned to evaluate the impact of the dam, according to Egypt's Minister of Water Resources and Irrigation Hossam Moghazi.
Controversial points were also to have been dealt with, ahead of conducting technical studies to determine the impact of building the dam on Sudan and Egypt. The reason for the adjournment was the government reshuffle in Ethiopia, Moghazi added.
Egypt had already sent official invitations to the meeting, to be chaired by the Egyptian National Committee of the Grand Ethiopian Dam, to Sudan and Ethiopia, along with representatives from the consultancy firm studying the impact of the dam.
“It is just another setback in a series of setbacks in the negotiations to reach an agreement on the dam. The meeting was supposed to be held in the second half of September, or possibly earlier, to discuss the impact of the withdrawal of one of the consultancy firms,” said a diplomat who asked to remain anonymous.
It is no wonder that officials are not pleased with the outcome of the negotiations, assuming that there were any, the diplomat added. He was referring to an official from the Irrigation Ministry who told Al-Shorouk newspaper that the ministry has submitted a number of reports stating that it is not possible to continue with the “present scenario of futile meetings.”
The official, who preferred not to give his name, told Al-Shorouk, “Even though the agreed studies are carried out by the French consultancy firm, there will not be any results for at least 11 months, and in the light of the continued construction of the dam, and its imminent partial operation, the results of the studies will be useless, especially those related to the height and size of the dam.”
The situation now needs a decision to be taken and no more procrastination, he stressed. Marzouk agreed that it is high time to stop the negotiations and resort to one of two scenarios: either the three parties meet to discuss controversial points like the direct impacts of the dam, the storage capacity and the filling time, and reach a compromise on these matters, or they take the matter to the African Union and the United Nations.
“We should resort to the UN in order to try to resolve a problem that is manageable at present, before it changes into a situation that threatens the peace and security of the Nile Basin countries,” he said.
Postponing the 9th round of discussions has not been the only hurdle that has recently faced the negotiations. Last month, the two consultancy firms that were supposed to submit their studies on the dam failed to meet the deadline for the second time.
One of them withdrew from the studies, leaving Egypt with the possibility of having to choose another firm, which may take another six months.
The studies are being commissioned by the TNC, made up of Ethiopia, Sudan and Egypt. The committee includes four representatives and experts from Egypt, Ethiopia and Sudan.
Conflict over the dam goes back to the period before the 25 January Revolution, when Egypt attempted several times to prevent the construction of the dam due to concerns over its effect on the Nile water quota reaching Egypt.
The differences took a sharp turn when Ethiopia diverted the course of the Blue Nile to start the building process in May 2013.
The dam and its effect on Egypt's water quota remained a cause of difference between Egypt and Ethiopia until President Abdel-Fattah Al-Sisi held talks with his Ethiopian counterpart, Mulatu Teshome, earlier this year. The two countries then decided to open a new chapter of cooperation and confidence-building measures.
In March, Egypt, Ethiopia and Sudan met in Sudan and signed a Declaration of Principles on the GERD that included cooperation between the three countries regarding their water needs, with the aim of improving sustainable development and regional economic integration. All three countries also agreed to not cause harm to any of the signatories.
Marzouk does not regard the agreement as a legally binding document, however. “It is a declaration of good intentions that allowed Addis Ababa to carry on the building process and not take any measures to guarantee Egypt's share of the Nile water after the completion of the dam,” he said.
After the signing, the three countries agreed to sign contracts with the French and Dutch consultancy firms to carry out studies of the dam's possible effects on the accessing of water by the downstream countries. The studies are also expected to determine the time period it will take for the dam to be filled and the possible environmental and social impacts on Egypt and Sudan.
The Grand Ethiopian Renaissance Dam, scheduled to be completed in 2017, will be Africa's largest hydroelectric power plant, with a storage capacity of 74 billion cubic metres of water and a height of 145 metres.
Egypt has voiced concerns about its share of the Nile's water, since the country depends on the Nile for 95 per cent of its water needs. As stipulated in a 1959 treaty, Egypt currently receives 55.5 billion cubic metres of Nile water and Sudan gets 18 billion cubic metres.
According to the Irrigation Ministry, Egypt is already suffering from a water deficit of 20 billion cubic metres a year, which means it cannot accept any other possible fall in its water quota.


Clic here to read the story from its source.